METHOD FOR CONSTRUCTING DOUBLE ENLARGEMENT BEARING TYPE PERMANENT GROUND ANCHOR
摘要
PURPOSE: A construction method for a double-extendable bearing permanent ground anchor is provided to improving anchorage with a wedge by grouting a mounting part. CONSTITUTION: A construction method for a double-extendable bearing permanent ground anchor comprises following steps. A boring hole(1) is punched underground(S10). A double-extendable bearing permanent ground anchor is inserted into the boring hole(S20). A deep-seated blockade packer(50) of the double-extendable bearing permanent ground anchor is filled with milk in order to seal the boring hole(S30). A tension member(60) of the double-extendable bearing permanent ground anchor is tensed and a wedge(30) is expanded and is stuck underground(S40). A first grout(G1) is mounted in a space between an inner lower body(20) and a wedge and the boring hole of the fixed head(S50).
申请公布号
KR100950593(B1)
申请公布日期
2010.04.01
申请号
KR20090074909
申请日期
2009.08.13
申请人
SIN DO ENI CO., LTD.;LEE, SEONG RAK
发明人
PARK, WOO YOUNG;LEE, SUNG RAK;YOO, SUNG JIN;LEE, KI SUN