摘要 |
PURPOSE: A method of automatically calculating operating time in a production line and a logistics simulation using a computer is provided to automatically calculate time table information by time analysis of a line process, thereby removing difficulties due to addition of a complex logic and manual measurement. CONSTITUTION: An operation measurement target is selected(301). An event table is generated(302). Start and end event are selected(303). Automatic assignment of operation ID and an operation name are inputted(304). If the operation ID is a Start ID, end event information is generated(307). If the operation ID is not the start ID, start event information is generated(306). Time table information is generated(308). Generation and addition of the text file are performed(309). |