发明名称 MESSER TUNNEL CONSTRUCTION METHOD USING UPPER FIRST EXCAVATION METHOD
摘要 PURPOSE: A mesa tunnel construction method using an upper line excavation method is provided to reduce construction cost, improve safety, and reduce construction period. CONSTITUTION: A mesa tunnel construction method using an upper line excavation method comprises following steps. In the excavation section which is divided into two or more upper and lower sections by a mesa shield construction method, excavation is enabled from the upper part of the excavation section to the lower part of the excavation section. After the excavation of the upper part, a support member(500) is coupled with the lower part of struts(200). The lower part of the excavation section is excavated by the mesa shield construction method.
申请公布号 KR100949774(B1) 申请公布日期 2010.03.30
申请号 KR20090068772 申请日期 2009.07.28
申请人 YEOM, MYEONG HO 发明人 YEOM, MYEONG HO
分类号 E21D9/06 主分类号 E21D9/06