发明名称 HOLE-BORING AND HAMMERING-VIBRATION WORKING METHOD AND DEVICE FOR INTEGRATED CONSTRUCTION WITH SHEET-PILE FIXED TO OUTSIDE OF HOLE-BORING AUGER CASING
摘要 PURPOSE: A method and a device for boring and hammering an integrated sheet pile for integrated construction is provided to carry out integrated construction by simultaneously hammering the casing and the sheet pile using a vibratory hammer. CONSTITUTION: A device(100) for boring and hammering an integrated sheet pile for integrated construction comprises a guide rail, a vibro-hammering unit(120), a clamp(122), and an auger(116). The guide rail is vertically arranged on the surface. The vibro-hammering unit is installed in the guide rail to be vertically moved. The vibro-hammering unit hammers a casing(124) fixed on a lower part. The clamp fixes a sheet pile(126) to contact the outside of the casing. The auger has a perforation rod(118).
申请公布号 KR100949606(B1) 申请公布日期 2010.03.25
申请号 KR20090065515 申请日期 2009.07.17
申请人 KIM, SUNG SOO;CHOI, YONG KYU;PARK, TAE YOUNG;MU-SUNG CONSTRUCTION CO., LTD.;WOOJIN E&C;GEOTECHNICAL RESEARCH & DEVELOPMENT CO., LTD. 发明人 PARK, TAE YOUNG;CHOI, YONG KYU;KIM, SUNG SOO
分类号 E02D7/08;E02D5/04;E02D11/00;E21B3/02 主分类号 E02D7/08
代理机构 代理人
主权项
地址