摘要 |
<p><P>PROBLEM TO BE SOLVED: To reduce work man-hours required for a change of an inline configuration, and to perform correction without contradiction. <P>SOLUTION: In the inline configuration management system, setting of an apparatus of an inline configuration target is performed to a production order table, a partial production lot is created from the production order table performed with intention entry, a working production lot is created by use of an existing production lot based on the partial production lot, a working production plan is prepared based on the working production lot, a working production order table is created based on the working production lot, a working assembly SEQ is created based on the working production order table, the working assembly SEQ is compared and collated with an existing assembly SEQ to decide propriety of update, the existing assembly SEQ is updated when the update is possible, and the existing production order table, an existing production plan, and the existing production lot are updated based on the working production order table, the working production plan, and the working production lot when the update is possible. <P>COPYRIGHT: (C)2010,JPO&INPIT</p> |