PURPOSE: A concrete curing construction method during winter using a lamp is provided to reduce construction cost by reducing cost required for curing. CONSTITUTION: A concrete curing construction method during winter comprises following steps. Many latching parts are formed on a ceiling surface of a mold(20). A connecting cable(11) with a hook(12) formed on both sides and a power cable(13) with a connecting jack(14) are connected to both sides of a lamp(10). The lamps are positioned on the ceiling of the mold and a side wall at fixed intervals by latching the both hooks on the latching part. Power is applied through a power source cable by connecting a connection jack of the lamp which is adjacent to another lamp.