发明名称 CONSTRUCTION METHOD OF STRUCTURE
摘要 PROBLEM TO BE SOLVED: To provide a construction method of a structure improving workability in constructing the structure inclined with respect to the ground surface. SOLUTION: The method of constructing the structure inclined with respect to the ground surface sequentially up to an upper story part is carried out by repeating a step of arranging a workbench 40 corresponding to the external wall surface of a construction object floor to construct the construction object floor using the workbench 40 and then lifting the workbench 40 to the following construction object floor along the external wall surface. In the method, the workbench 40 is lifted to the following construction object floor by being moved in the inclined direction of the structure. COPYRIGHT: (C)2010,JPO&INPIT
申请公布号 JP2010048060(A) 申请公布日期 2010.03.04
申请号 JP20080215871 申请日期 2008.08.25
申请人 SHIMIZU CORP;KAWADA CONSTRUCTION CO LTD;JFE CIVIL ENGINEERING & CONSTRUCTION CORP 发明人 OBA YOSHITO;MORIYA NORIKAZU;KOBAYASHI HIDETO;OTANI MITSURU;SUZUKI TATSUO
分类号 E01D21/00;E01D11/00;E01D19/14;E04G1/04;E04G3/00;E04G3/24;E04G11/28 主分类号 E01D21/00
代理机构 代理人
主权项
地址