发明名称 Method for protection of reconstruction pipe placed in sewer pipe between two inspection chambers, involves winding sewer pipe over profiled plastic strips, where ends of sewer pipe freely lead into each of two inspection chambers
摘要 <p>The method involves winding a sewer pipe (5) over a profiled plastic strips, where the ends (7) of the sewer pipe freely lead into each of the two inspection chambers (1). The pressure in a hollow chamber (14) is equalized against the pressure in the inspection chamber, where the hollow chamber is formed by the two ends bricking up (3), the inner surface of the sewer pipe and the outer surface of the reconstruction pipe (10). An independent claim is included for a device for protection of a reconstruction pipe placed in a sewer pipe between two inspection chambers.</p>
申请公布号 DE102008044517(A1) 申请公布日期 2010.02.25
申请号 DE20081044517 申请日期 2008.09.12
申请人 STUEKERJUERGEN, FERDINAND 发明人 STUEKERJUERGEN, FERDINAND
分类号 E03F3/06;F16L55/162 主分类号 E03F3/06
代理机构 代理人
主权项
地址