摘要 |
<P>PROBLEM TO BE SOLVED: To enable one person to easily execute the connection of a connection clip unit and an operation wire and the loading of the connection clip unit to a sheath. Ž<P>SOLUTION: A loading tool 82 is held in a left hand; then the sheath 11 held in a right hand is inserted to a case mounting groove 102, and a front hook 58 is piled up on the connection member 48 of the connection clip unit 13. While holding the loading tool 82, a first opening/closing member 100 is closed with the left hand, a rear hook 59 is pressurized by a fitting assisting projection 112, and the front hook 58 is fitted to the fitting part 55 of the connection member 48. The first opening/closing member 100 is opened to insert the sheath 11 to a sheath insertion hole 105. A second opening/closing member 101 is closed with the left hand to clamp the distal end of the sheath 11, and the sheath 11 is held at the same time. The operation wire 12 is pulled with the right hand, and the connection clip unit 13 inside the loading tool 82 is pulled into the sheath 11. Ž<P>COPYRIGHT: (C)2010,JPO&INPIT Ž
|