发明名称 CONSTRUCTION METHOD OF TUNNEL IN LARGE DEPTH AND AT HIGH WATER PRESSURE
摘要 PROBLEM TO BE SOLVED: To provide a method of constructing a main tunnel by using a drilling machine at normal low water pressure while conserving ground water by performing water conveyance without performing complete drain. SOLUTION: A guide tunnel is excavated in a large depth and at high water pressure in parallel with the main tunnel and ahead of the main tunnel, and a headrace is provided by conducting borings from the guide tunnel. The headrace is formed in an umbrella shape from a cross-sectional view where it covers the top of the main tunnel. Then the ground water positioned at the top of the main tunnel is discharged from the headrace, and a low water pressure block 4 is formed under the umbrella-shaped headrace, The main tunnel is excavated by the conventional construction method of a tunnel in a state where the main tunnel penetrates the low water pressure block. COPYRIGHT: (C)2010,JPO&INPIT
申请公布号 JP2010031556(A) 申请公布日期 2010.02.12
申请号 JP20080195126 申请日期 2008.07.29
申请人 TAISEI CORP 发明人 SHIMOSHIGE MICHITO
分类号 E21D9/00;E21D9/04 主分类号 E21D9/00
代理机构 代理人
主权项
地址