发明名称 |
DETERMINING THE STRUCTURE OF A TOWED SEISMIC SPREAD ELEMENT |
摘要 |
A technique includes obtaining a plurality of sets of measurements of distances between nodes located on a seismic spread element while the element is in tow. Each set is acquired in response to the operation of a different set of sources. The technique includes determining a three-dimensional structure of the seismic spread element while in tow based at least in part on the sets of measurements.
|
申请公布号 |
US2010002538(A1) |
申请公布日期 |
2010.01.07 |
申请号 |
US20080168121 |
申请日期 |
2008.07.05 |
申请人 |
FRIVIK SVEIN ARNE;GROENAAS HALVOR;WELKER KENNETH E |
发明人 |
FRIVIK SVEIN ARNE;GROENAAS HALVOR;WELKER KENNETH E. |
分类号 |
G01V1/38 |
主分类号 |
G01V1/38 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|