摘要 |
PURPOSE: An artificial structure construction method of a cut surface is provided to reduce construction cost and construction period by stabilizing a cut surface. CONSTITUTION: An artificial structure construction method of a cut surface comprises followings. A cut surface(100) is formed in a desired shape. A plurality of drain pipes(200) are formed on the cut surface. Cement mortars(400,600) are formed on the cut surface to hide the drain pipes. Thin mortar is formed on the cut surface on which the cement mortars are formed. A plurality of drain pipes are extended to the lower part of the cut surface. A waterway is formed on the lower part of the cut surface to guide water to the outside. |