摘要 |
<P>PROBLEM TO BE SOLVED: To solve a problem of poor working efficiency in building up and dismantling because single pipes are arranged in horizontal and vertical directions and fastened and connected by clamps using a wrench in the case of constructing a scaffolding jamb on an unstable place of the ground, a slope, or the like. Ž<P>SOLUTION: A unitized frame-like body 13 is used for connecting a plurality of erected posts 5. An insertion type connecting implement 21 is mounted to the frame-like body 13 and inserted in an insertion opening 7 provided at the post 5, from the upper side for connection. The connecting implement is provided with a locking means to prevent upward slip-off. The jamb can thereby be easily built up and dismantled. Ž<P>COPYRIGHT: (C)2010,JPO&INPIT Ž
|