发明名称 |
TEMPORARY BRIDGE CONSTRUCTION SYSTEM USING A STEEL PIPE STRUCTURE |
摘要 |
PURPOSE: A temporary bridge system using a circular steel pipe is provided to temporarily install a support structure by using I section steel beam and so on. CONSTITUTION: A temporary bridge system using a circular steel pipe comprises a lower structure(100) and an upper plate structure(200). The lower structure includes a temporary bent. The temporary bent is installed in the ground to be spaced longitudinally. The upper plate structure includes a lining board. A circular steel pipe(300) is installed between the lower structure and the upper plate structure. The circular steel pipe is installed in the upper side of a horizontal beam(110) of the lower structure by a fixing backing plate. The fixing backing plate includes a bolt and a nut. The one or more circular steel pipes are installed in parallel. A horizontal connecting member horizontally restricts the circular steel pipe. |
申请公布号 |
KR20090130798(A) |
申请公布日期 |
2009.12.24 |
申请号 |
KR20080058750 |
申请日期 |
2008.06.16 |
申请人 |
CIVIL DESIGN TECHNOLOGIC ENGINEERING CO., LTD. |
发明人 |
I, JU HYEON |
分类号 |
E01D21/00 |
主分类号 |
E01D21/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|