摘要 |
The controlling method involves making control units (2A-2D) communicate continuously with each other and/or with a central communication unit (15) during the operation of a wind energy park. A second control unit is made to take over the control tasks of a first control unit when the first control unit becomes defective. The second control unit is selected depending on a priority assigned to it and has the same as or a lower priority than the defective control unit. |