摘要 |
The first reception operation is started in response to an acquisition request. Power supply to a RF unit and a demodulator is stopped after synchronization with the GPS signal is established. Based on information acquired from a sub-frame in the GPS signal, a time point to start the second reception operation is determined. Elapsed time is counted using a counter clock synchronized with transmission timing of the navigation message, while a reception frequency of the satellite, a PRN code unique to the satellite, and a frequency and a phase of the PRN code are retained. When the elapsed time arrives at the time point, the power supply to the RF unit and the demodulator is restarted.
|