摘要 |
A solar panel including array converters is installed in a solar power generation system by first completing a self-test of the solar panel in an uninstalled state. Certain data is obtained and compared to specifications to verify proper operation. Other data obtained is compared to a work order to insure the intended unit is being installed. A functional, proper panel is installed into the solar power generation system, then tested again in an operational state. The system includes steps for activating a system, wherein a system that is not activated within a predetermined time period will no longer operate. The solar power generation system may be monitored remotely, thereby allowing maintenance to be performed on an as-needed basis. |