发明名称 METHOD OF BOTTOM HOLE PUMPING EQUIPMENT OVERHAUL PERIOD INCREASE IN PRODUCTION WELL COMPLICATED WITH SCALING
摘要 FIELD: oil-and-gas production. ^ SUBSTANCE: according to method of bottom hole pumping equipment overhaul period increase in the production well complicated with scaling periodically perform preliminary cleaning out of oil film and asphalt resin paraffin of the mentioned above equipment - pumping of organic solvent into well, then removal of iron saline disposals from the equipment surface - pumping composition with % content: chlorohydric acid or acetic acid 25, corrosion inhibitor 18, scaling inhibitor 17, water 40, in to stopped well tubing annulus, overflush into pump and withstand it 1.5-2.0 hours, that mention above composition used in volume of 5.0-5.5% to well liquid volume from dynamic level to pump intake. ^ EFFECT: production well pumping equipment overhaul period increase. ^ 1 ex
申请公布号 RU2375554(C2) 申请公布日期 2009.12.10
申请号 RU20080105871 申请日期 2008.02.15
申请人 GARIFULLIN FLORIT SAGITOVICH;DOLGOV DENIS VIKTOROVICH;MINJAZEV INZIR KUTDUSOVICH;VALEEV ASGAR MARATOVICH;VOLOCHKOV ALEKSEJ NIKOLAEVICH 发明人 GARIFULLIN FLORIT SAGITOVICH;DOLGOV DENIS VIKTOROVICH;MINJAZEV INZIR KUTDUSOVICH;VALEEV ASGAR MARATOVICH;VOLOCHKOV ALEKSEJ NIKOLAEVICH
分类号 C09K8/528;E21B37/06 主分类号 C09K8/528
代理机构 代理人
主权项
地址