摘要 |
Mobile drilling rig 10 includes a carrier frame 14 and a mast 12 supported on the frame. A top drive 16 is supported on the mast when in an operative position, and a coil tubing injector 20 is supported on the mast when in an operative position. A first dolly assembly 22 and a second dolly assembly 60 are provided each for supporting a portion of the carrier frame, and include a first plurality of wheels on a first plurality of axles. Each dolly assembly is adaptive for selective attachment to and detachment from the carrier frame, so that the dolly assemblies may be changed out for compliance with regulations and road conditions.
|