发明名称 CONSTRUCTION METHOD FOR UNDERGROUND VERTICAL SHAFT STRUCTURES
摘要 PURPOSE: A construction method of an underground vertical structure is provided to construct the underground vertical structure consecutively and rapidly by implementing 'a stepwise ground excavation process at underground' and 'a stepwise wall structure molding process at the ground' at the same time. CONSTITUTION: A construction method of an underground vertical structure is as follows. 'A stepwise ground excavation process at underground', 'a slope protection and arrangement process of the excavated ground', 'a stepwise wall structure molding process at the ground', and 'a steam curing process' are implemented at the same time. One end fixed on an earth anchor formerly buried in the ground is connected to the other end of a pulling unit. The pulling unit is operated, and then the underground vertical structure is gradually dropped to a set depth of underground.
申请公布号 KR20090124284(A) 申请公布日期 2009.12.03
申请号 KR20080050402 申请日期 2008.05.29
申请人 JANG, YOUNG MI 发明人 JANG, YOUNG MI
分类号 E02D29/045 主分类号 E02D29/045
代理机构 代理人
主权项
地址