发明名称 EQUIPMENT MANAGEMENT SYSTEM
摘要 <P>PROBLEM TO BE SOLVED: To precisely predict a time zone when the load of the processing of the control and monitoring of equipment to be managed by a local management device is reduced, and to reduce the burden of a processing for predicting the time zone. Ž<P>SOLUTION: This equipment management system is configured by connecting a local management device 1 to which an illumination control unit 5a and a measurement management unit 5b are connected for controlling and monitoring the illumination control unit 5a and the measurement management unit 5b according to a program and a program server 3 for storing update information to be used for the update of the program of the local management device 1 to a network 4. The local management device 1 searches a time zone when the schedule of the control and monitoring of the illumination control unit 5a or the measurement management unit 5b is reduced, that is, the load of processing is reduced based on an operation schedule acquired from the illumination control unit 5a or the measurement management unit 5b, and updates the program in the time zone when the load is reduced. Ž<P>COPYRIGHT: (C)2010,JPO&INPIT Ž
申请公布号 JP2009271603(A) 申请公布日期 2009.11.19
申请号 JP20080119226 申请日期 2008.04.30
申请人 PANASONIC ELECTRIC WORKS CO LTD 发明人 MATSUMOTO TADASHI;FUJIMURA HIDEKI
分类号 G06F9/445;G06F11/00;G06F13/00 主分类号 G06F9/445
代理机构 代理人
主权项
地址