发明名称 CONSTRUCTION METHOD OF SEMI-INTEGRAL ABUTMENT BRIDGE USING STEEL BOX GIRDER
摘要 PURPOSE: A construction method of a half integrated abutment bridge using a steel box girder is provided to supplement a limitation on an application and integrate an abutment and an upper structure. CONSTITUTION: A banking task of an abutment section is performed and a pile(120) is constructed. A lean concrete(130) of an alternating foundation is applied and a pile head is reinforced. A spread foundation(210) is constructed and an abutment(220) is constructed by pouring concrete an alternating sphere and a wing wall. A bridge bearing(230) is set up. A backfilling task is performed in the alternating rear side. A first support slab(710) and a second support slab(780) are constructed. An approach slab(750), a shock-absorbing slab(760) and a main track packing section(770) are successively constructed. An expansion/contraction control apparatus(810) is set up between the approach slab and the shock-absorbing slab. A bridge deck is packed in an asphalt or a LMC(Latex Modified Concrete).
申请公布号 KR20090118433(A) 申请公布日期 2009.11.18
申请号 KR20080044205 申请日期 2008.05.13
申请人 KOREA EXPRESSWAY CORP. 发明人 PARK, YOUNG HO;KIM, SUNG HWAN;KIM, NAK YOUNG;NAM, MOON SUK;LEE, BYEONG JU;OK, CHANG KWON;LEE, WON TAE;HEO, JAE HUN
分类号 E01D2/04;E01D21/00 主分类号 E01D2/04
代理机构 代理人
主权项
地址