发明名称 SECONDARY BATTERY CURRENT CUT-OFF METHOD AND BATTERY PACK USING SAME
摘要 PROBLEM TO BE SOLVED: To provide a novel and improved secondary battery current cut-off method efficiently cutting off the current flowing along a large current path of the secondary battery by precisely calculating a cut off time point of the current flowing along the large current path of the secondary battery. SOLUTION: The secondary battery current cut-off method includes a current measuring step of measuring a current value when the current flows along the large current path of the secondary battery, a time measuring step of measuring a current flowing time at a moment when the current flows at the current measuring step, an allowed-time setting step of setting an allowed time for which current flowing is allowed depending on the magnitude of the current value measured at the current measuring step and the current cut-off step of cutting off the large current path when detecting that the current flowing time exceeds the an allowed time. COPYRIGHT: (C)2010,JPO&INPIT
申请公布号 JP2009266820(A) 申请公布日期 2009.11.12
申请号 JP20090106677 申请日期 2009.04.24
申请人 SAMSUNG SDI CO LTD 发明人 IM SUNG-BIN
分类号 H01M10/44;H02J7/00 主分类号 H01M10/44
代理机构 代理人
主权项
地址