PURPOSE: A complex slope stabilizing process is provided to improve the strength of the ground in a pressure type without separate equipment. CONSTITUTION: A complex slope stabilizing process comprises following steps. A perforation section(1) is formed on the ground and a nail assembly is inserted into the perforation section. First grouting is performed in an inlet space of the perforation section. Second grouting is performed in a pressure type in the inner space of the perforation section. Third grouting is performed on the part in which the second grouting is performed. A pressure plate is installed in a nail(3) and the surface is processed. The nail is pulled and is provided with tensile force and is fixed.
申请公布号
KR100925677(B1)
申请公布日期
2009.11.10
申请号
KR20090058819
申请日期
2009.06.30
申请人
GREEN ENG CO., LTD.;BOMYOUNG ENC CO., LTD.;SEWON ECOTECH CO., LTD.;SEWON DEVELOPMENT CO., LTD.;ECO GREEN CORPORATION