摘要 |
A method (100) is disclosed for determining the behaviour of an integrated circuit comprising a plurality of resources and being configured to execute a plurality of operations that each require temporary allocation and deallocation of at least a subset of the plurality of resources during said execution. The method comprises the steps of monitoring (130) the execution of at least some of the plurality of operations during an execution run of the IC, capturing (140) events indicating the (de)allocation of resources during said execution, capturing events (150) indicating an operational relationship between allocated resources during said execution, assigning (140, 150) a time stamp to each event; and making (160) the captured events available for visualization. This facilitates the visualization of events that are interrelated in terms of the operation to which they are assigned at a given time instant. This visualization may be realized in the form of a connectivity graph, for which another method (200) is disclosed. |