发明名称 CONSTRUCTION METHOD FOR JOINT OF CANTILEVER USING HORIZONTAL BRACE AND CONSTRUCTION METHOD FOR GIRDER OF BRIDGE USING THE SAME
摘要 PURPOSE: A bind construction method of a cantilever using a horizontal strut and a girder construction method using the same are provided to take a stability examination of a structure event if it is make in a place where accessibility is not good. CONSTITUTION: A horizontal strut(100) is installed between cantilevers(10) and supports. A strain gage is installed on the horizontal strut. A connecting member(20) is made by pouring concrete around the horizontal strut and connects the cantilevers. The cantilever and connecting member are connected with the pre-stressing force by a tendon(30).
申请公布号 KR20090109260(A) 申请公布日期 2009.10.20
申请号 KR20080034616 申请日期 2008.04.15
申请人 SAMSUNG C&T CORPORATION 发明人 KIM, DONG WAN;KIM, HWA SOO;LEE, CHANG HOON;SONG, JONG YOUNG;JUNG, SEUNG KWAN;YOO, YOUNG KEUN
分类号 E01D21/00;E01D2/00 主分类号 E01D21/00
代理机构 代理人
主权项
地址