发明名称 |
CONCRETE FILLED COLUMN WITH DOUBLE STEEL TUBE AND CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE USING THE SAME |
摘要 |
PURPOSE: A concrete charge post with a double steel pipe and an underground structure construction method using the same are provided to shorten the construction period by building a structure on the ground at the same time as construction of an underground structure. CONSTITUTION: A concrete charge post comprises a hollow inner steel pipe(10), an outer steel pipe(12), and a filler(14). The outer steel pipe is installed to surround the inner steel pipe with a gap. The filler is filled between the inner steel pipe and the outer steel pipe. |
申请公布号 |
KR20090108880(A) |
申请公布日期 |
2009.10.19 |
申请号 |
KR20080034213 |
申请日期 |
2008.04.14 |
申请人 |
UNIVERSITY OF SEOUL INDUSTRY COOPERATION FOUNDATION. |
发明人 |
CHOI, SUNG MO;BANG, JUNG SECK;CHAE, HEUNG SEOK |
分类号 |
E02D29/045;E21D9/04 |
主分类号 |
E02D29/045 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|