发明名称 AUTOMATED MUD SLOWNESS ESTIMATION
摘要 <p>An integrated framework is described for automating some or all of mud slowness estimation for both fast and slow formations. An estimation of fluid slowness based on monopole radial profiling is calculated if conditions permit. Alternatively, an estimation of fluid slowness based on Scholte wave slowness is estimated if conditions do not permit calculation based on monopole radial profiling. Tool standoff may also be estimated based on monopole radial profiling.</p>
申请公布号 WO2009126774(A2) 申请公布日期 2009.10.15
申请号 WO2009US40014 申请日期 2009.04.09
申请人 SERVICES PETROLIERS SCHLUMBERGER;SCHLUMBERGER CANADA LIMITED;SCHLUMBERGER HOLDINGS LIMITED;SCHLUMBERGER TECHNOLOGY B.V.;PRAD RESEARCH AND DEVELOPMENT LTD;VALERO, HENRI-PIERRE;DJIKPESSE, HUGUES, A.;SINHA, BIKASH, K. 发明人 VALERO, HENRI-PIERRE;DJIKPESSE, HUGUES, A.;SINHA, BIKASH, K.
分类号 E21B21/08;G01V3/18;E21B47/00;G01V1/28;G01V3/00 主分类号 E21B21/08
代理机构 代理人
主权项
地址