摘要 |
<p>The method involves filling a load distribution hollow space (8), anchor boreholes (3), flush boreholes (10) and outlet boreholes (9) with mortar. Anchor rods (11) e.g. threaded rods, are inserted into the flush boreholes and the outlet boreholes before filling the flush and outlet boreholes with the mortar. The anchor rods comprise connecting elements (12) at an end projecting from a front side of a supporting wall (1) and made of concrete ribbed steel. Wire baskets are attached to the connecting elements of the anchor rods. The wire baskets are filled and closed with stones.</p> |