发明名称 Installing piles or tunnel setions using two or more syncronised impact drivers
摘要 An arrangement (1) for installing building elements having a diameter in excess of 5 meters, and for installing tunnel sections, into a ground formation is disclosed. The arrangement includes a building element (2), on which two or more impact drivers (3) for delivering blows to the element (2) are mounted. The arrangement further has a control system for synchronising the blows to be delivered to the element (2), wherein the control system is able to synchronise the blows within 10 milliseconds.
申请公布号 NZ552864(A) 申请公布日期 2009.09.25
申请号 NZ20050552864 申请日期 2005.07.26
申请人 IHC HOLLAND IE B.V. 发明人 HESSELS, JOHANNES LOUIS LEONARDUS;VAN FOEKEN, ROBERT JAN;VAN DUIJVENBODEN, ARRIS
分类号 E02D7/00;E02D7/06;F15B21/02 主分类号 E02D7/00