发明名称 FOUNDATION REINFORCING CONSTRUCTION METHOD FOR EXISTING STRUCTURE
摘要 PROBLEM TO BE SOLVED: To provide a foundation reinforcing construction method for reinforcing a foundation to withstand increased weight of an existing structure securely without restricting use of the existing structure. SOLUTION: In this foundation reinforcing construction method, one or more predetermined foundation peelers are selected from among a plurality of existing foundation peelers as piles 1H to be reinforced, and a transverse hole 4<SB>1</SB>reaching the piles 1H to be reinforced is dug along a bottom face 2a of the existing structure 2 in the ground just below the existing structure 2. The ground in water between a cylindrical supporting member 7 and the pile 1H to be reinforced is excavated by using an underwater excavator 8 while press-fitting the supporting member 7 into the ground around the pile 1H to be reinforced by using the bottom face 2a of the existing structure 2 as a reaction force receiving face. Concrete is placed in a diameter extended hole 5 formed by the excavation and around an upper part of the pile 1H to be reinforced exposed into the transverse hole to construct a diameter extended reinforcing part around the pile 1H to be reinforced by placing concrete. Then, concrete is placed in the transverse hole 4<SB>1</SB>to construct an underground beam. COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2009209547(A) 申请公布日期 2009.09.17
申请号 JP20080052019 申请日期 2008.03.03
申请人 NIPPON STEEL CORP;OKUMURA CORP 发明人 KIMURA TAKANORI;TAKANO YOSHIHIRO;YAMADA YUKI;TSUJIMOTO KYOHEI;ICHIMARU HIROMI;TAKEKATA HIDETOSHI;FURUNAGA TATSUHIRO
分类号 E02D27/34;E02D17/06;E02D27/12;E02D27/28;E02D27/48;E02D27/52 主分类号 E02D27/34
代理机构 代理人
主权项
地址