发明名称 CONSTRUCTION COST MANAGEMENT DEVICE AND METHOD
摘要 <P>PROBLEM TO BE SOLVED: To easily calculate productivity in a work group in reference to standard productivity. <P>SOLUTION: A cost ratio r(j, i) of an item of each work in the work group is calculated in each item in reference to the standard productivity. The ratio r(j, i) of each work is multiplied by a necessary amount of each item backed by results, and inputted about the work group, and the productivity of the work, i.e., the necessary amount m<SB>i</SB>of the item of the work is calculated by m<SB>i</SB>=N<SB>i</SB>&times;r(j, i). Cost of the item i is obtained by N<SB>i</SB>&times;r(i, j)&times;c'(i), and unit price of a work amount unit of the work j is calculated by &Sigma;<SB>i</SB>(N<SB>i</SB>&times;r(i, j)&times;c'(i)/O<SB>j</SB>) when a work amount of the work j is set as O<SB>j</SB>. <P>COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2009205454(A) 申请公布日期 2009.09.10
申请号 JP20080047225 申请日期 2008.02.28
申请人 MIYA SYSTEM INC 发明人 MIYAWAKI KIYOYUKI
分类号 G06Q10/00;G06Q10/06;G06Q50/00;G06Q50/08 主分类号 G06Q10/00
代理机构 代理人
主权项
地址