摘要 |
PROBLEM TO BE SOLVED: To provide a concrete placing method which can realize the shortening of a construction period associated with the concrete placing method and a reduction in construction cost, and a plate material for a form for use in the concrete placing method. SOLUTION: In a pair of plate materials 10 for the form, a reinforcing material 3 is arranged on one surface of a supporting plate 1, and a heat insulating plate 2 is arranged on the other surface of the supporting plate 1. A concrete skeleton 200 is completed through: a step of forming the form 100 by arranging the pair of plate materials 10 for the form in an opposed manner so that the reinforcing materials 3 can be each positioned on the outside; a step of pouring concrete 30 into the form 100; and a step of arranging a wall material 40 on the supporting plate 1 in the state of removing only the reinforcing material 3 from the form 100 after the solidification of the concrete 30 and embedding the supporting plate 1 as-is. COPYRIGHT: (C)2009,JPO&INPIT
|