摘要 |
<p>The element (33) has a forming area element forming a form area, and a set of window points (61) formed in the formwork element. The formation of window points excludes a concrete window (61.1) from the forming area element, and replaceably arranges a window formwork (61.3) or a concrete connector (61.2) in a recess of the concrete window. Ribs run over an entire length of the formwork element, and frames transverse to the ribs are supported on a formwork carriage. The window points are formed by two modifications in the ribs. An independent claim is also included for a formwork device comprising a tunnel formwork.</p> |