摘要 |
A lift installation in a building which is divided into building zones G1, G2, G3, and G4 arranged vertically one above the other includes at least two lifts each with at least one lift cage. Each lift cage is independently movable by it own drive within an associated cage zone 14.1, 14.2 etc, and each cage zone includes at least one transfer story. At least one of the lifts has at least three lift cages arranged vertically one above the other in a shaft and at least three cage zones K1.3, K2.3, and K3.3 for example are allocated to a building zone, G3.
|