摘要 |
A construction method of a slope structure is provided to construct a strong slope structure not to break down due to the loss of soil even if soil under a structure is washed away by flowing water. A construction method of a slope structure comprises the steps of hardening soil surface and forming an incline, forming vertical hollows on the incline at regular intervals, installing a first gabion(12) having the height corresponded to the depth of the hollow into the hollow, and installing a second gabion(14) on the incline and the first gabion. |