摘要 |
PROBLEM TO BE SOLVED: To obtain a building and a construction method therefor which can improve workability and cut down on costs. SOLUTION: The building is provided with plywood 4 and a pillar 5B. The plywood 4 is cut into predetermined dimensions beforehand and has flexibility, and constitutes a structure. A groove 6 is formed on the surface of the pillar 5B in the longitudinal direction. The grooves 6 of the adjacent pillars 5BR, 5BL are butted against each other, and the hidden parts W3 of both sides of the plywood which are hidden in the groove 6 are subtracted from the dimension W1 between both ends on the engagement side of the plywood 4 in accordance with the dimension W1 between both ends on the engagement side of the plywood 4 and the depth D2 of the grooves 6 of the pillars 5BR, 5BL. After arranging the pillars 5BR, 5BL at spacings L1 smaller than the dimension W1 between both ends on the engagement side of the plywood 4, they are assembled. Then the plywood 4 is inserted and engaged between the assembled pillars 5BR, 5BL, of which the grooves 6 are butted against each other. COPYRIGHT: (C)2009,JPO&INPIT
|