摘要 |
#CMT# #/CMT# The method involves measuring two sequences of different loading conditions of a conveying equipment e.g. continuous conveyor, at two measuring points (5, 6) about two measuring intervals, respectively. The two measured sequences of different loading conditions are compared for the purpose of detection of characteristic sequences of the loading conditions. A location determination of one of the loading section is effectuated on the conveying equipment by the determination of a run time of the loading section from the measuring point (5) to the measuring point (6). #CMT#USE : #/CMT# Method for tracing loading sections of bulk goods i.e. lignite, on a conveying equipment e.g. continuous conveyor and web belt conveyor, in a power station. #CMT#ADVANTAGE : #/CMT# The method permits the detection and tracing of the flow of the bulk goods in an effective manner and allows the quality control of the bulk goods during the bulk goods distribution. #CMT#DESCRIPTION OF DRAWINGS : #/CMT# The drawing shows a schematic view of an open cast mining with a web belt conveyor. 1, 3 : Web belts 2 : Bucket wheel 4 : Boom 5, 6 : Measuring points. |