发明名称 SCHEDULE MANAGEMENT SYSTEM
摘要 <P>PROBLEM TO BE SOLVED: To provide a schedule management system for managing a personal schedule accompanied by geographical travel. <P>SOLUTION: The schedule management system includes: a result database 110 for storing past schedules (result data 111); a transportation database 120 storing transportation information (transportation data 121); a best route selection means 150 for selecting a best travel route based on action schedule information and the past schedules; a required time calculation means 160 for calculating time required for the best travel route based on the best route and the transportation information; a schedule preparation means 170 for preparing a schedule based on the required time, the best route and the action schedule information; and a schedule output means 180 for outputting the schedule. <P>COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2009140372(A) 申请公布日期 2009.06.25
申请号 JP20070317734 申请日期 2007.12.07
申请人 CHUGOKU ELECTRIC POWER CO INC:THE 发明人 OKU TAKASHI
分类号 G06Q10/00;G06Q10/06;G06Q10/10;G06Q50/00 主分类号 G06Q10/00
代理机构 代理人
主权项
地址