摘要 |
<p><P>PROBLEM TO BE SOLVED: To attain reduction of down time in generation of jam caused by life of consumables related to conveying (paper feeding roller, conveying roller, etc.), and to continuously perform operation without generation of delay jam for a while even if the paper feeding roller reaches its life. <P>SOLUTION: A conveying time of a specific section is measured, and when a delay time exceeds a set value, it is switched to a sequence having much jam margin. <P>COPYRIGHT: (C)2009,JPO&INPIT</p> |