摘要 |
<p>The method involves utilizing a recycled reinforced PVC sheet piling (1) to reinforce a dike. The PVC sheet piling is deepened by applying a liquid comprising a mixture of water, concrete and barite. Reinforced PVC sheet piling pieces of short lengths are manufactured, and interconnection of intestinal sections are performed using a sheet pile interlock, where the piling pieces are coupled by fittings (2). A narrow trench is digged in the dike to bring depth by utilizing a scissors-like grab.</p> |