摘要 |
PROBLEM TO BE SOLVED: To improve power generation efficiency by renewing a current advanced boiling water reactor (ABWR) by modifying it not on a large scale. SOLUTION: Further power generation through the agency of a steam turbine (41) with high-pressure saturated steam (23) produced by cooling high-pressure superheated steam (24) during a power generation process in a newly laid electrothermal semiconductor (100) after generating power with the electrothermal semiconductor (100) by producing the high-pressure superheated steam (24) through some modification of a licensed ABWR leads to combined power generation to improve the power generation efficiency. COPYRIGHT: (C)2009,JPO&INPIT
|