发明名称 REINFORCED CONCRETE BUILDING CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To provide a reinforced concrete building construction method which contributes to shortening of a construction period. SOLUTION: According to the reinforced concrete building construction method, erection construction work inclusive of column construction work on one story, beam construction work on a story immediately above the story concerned, and floor construction work of the story immediately above the story concerned, is carried out for each story. Herein, at least part of the stories are designated as work objective stories, and at least part of the column construction work, at least part of the beam construction work, and at least part of the floor construction work out of the erection construction work for the respective work objective stories are designated as preceding work sectors, and work sectors other than the preceding work sectors out of the whole erection construction work for the respective stories are designated as subsequent work sectors. Further at least part of the preceding work sectors (steps N-1 to N-3) on a certain story out of the work objective stories and part of the subsequent work sectors (steps (N-1)-1 to (N-1)-3) on any one of the stories lower than the story concerned are carried out in parallel with each other. COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2009102914(A) 申请公布日期 2009.05.14
申请号 JP20070276802 申请日期 2007.10.24
申请人 OHBAYASHI CORP 发明人 FUJIO NAOTO;SUGIMOTO KUNIYOSHI
分类号 E04B1/35;E04B1/20 主分类号 E04B1/35
代理机构 代理人
主权项
地址