摘要 |
PROBLEM TO BE SOLVED: To provide a reinforced concrete building construction method which contributes to shortening of a construction period. SOLUTION: According to the reinforced concrete building construction method, erection construction work inclusive of column construction work on one story, beam construction work on a story immediately above the story concerned, and floor construction work of the story immediately above the story concerned, is carried out for each story. Herein, at least part of the stories are designated as work objective stories, and at least part of the column construction work, at least part of the beam construction work, and at least part of the floor construction work out of the erection construction work for the respective work objective stories are designated as preceding work sectors, and work sectors other than the preceding work sectors out of the whole erection construction work for the respective stories are designated as subsequent work sectors. Further at least part of the preceding work sectors (steps N-1 to N-3) on a certain story out of the work objective stories and part of the subsequent work sectors (steps (N-1)-1 to (N-1)-3) on any one of the stories lower than the story concerned are carried out in parallel with each other. COPYRIGHT: (C)2009,JPO&INPIT
|