发明名称 STRUCTURE INSTALLATION FRAME, METHOD OF ASSEMBLING THE SAME, SOLAR BATTERY MODULE, AND CONSTRUCTION STRUCTURE USING THE STRUCTURE INSTALLATION FRAME
摘要 <P>PROBLEM TO BE SOLVED: To provide a structure installation frame which sufficiently withstands both vertical force and horizontal force, is low in parts count, and contributes to cost reduction. <P>SOLUTION: According to the structure of the structure installation frame, when a load is applied from a mounting bar 4 to a front bracket 2, a force based on the load is borne not only by bolts 14, 16 for rigidly connecting between a front end 4a of the mounting bar 4 and the front bracket 2, but also even by internal peripheral abutting portions 2k of side plates 2b, 2c of the front bracket 2, on which an upper edge 4d of the front end 4a of the mounting bar 4 is abutted, and therefore the force is borne by a plurality of points, i. e. the bolts 14, 16, and the internal peripheral abutting portions 2k of the respective side plates 2b, 2c. Therefore when compared with the case where a force applied to the front bracket 2 is borne only by bolts, the load-carrying capacity of a connection portion between the mounting bar 4 and the front bracket 2 is enhanced. <P>COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2009041286(A) 申请公布日期 2009.02.26
申请号 JP20070208425 申请日期 2007.08.09
申请人 SHARP CORP 发明人 SAGAYAMA KENICHI
分类号 E04D13/00;E04D13/18 主分类号 E04D13/00
代理机构 代理人
主权项
地址