发明名称 TOP-DOWN CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE WITH SLURRY WALL RETAINED BY SLAB DIAPHRAGM EFFECT
摘要 A top-down construction method for an underground structure with slurry walls is provided to support the gravity load by steel frame girders and the earth pressure by slabs in the simplified joining between the girders and slurry walls. A top-down construction method for an underground structure with slurry walls include the steps of building slurry walls(100) underground by casting concrete into a trench, forming base parts at lower ends of steel frame columns, forming spaces for securing steel frame beams(240) in the slurry walls, mounting the ends of the steel frame beams to positions in the slurry walls from which fillers are removed, and casting slab concrete on the steel frame beams.
申请公布号 KR20090020430(A) 申请公布日期 2009.02.26
申请号 KR20070085190 申请日期 2007.08.23
申请人 HANBIT STRUCTUAL ENGINEERING CO.;HANWHA E&C CORP. 发明人 LIM, IN SIG;LEE, JEONG BAE;JUNG, KI SEUNG;KIM, JAE DONG;KO, DONG WOO;LEE, JAI HO;WOO, SUNG WOO
分类号 E02D29/045;E02D17/04 主分类号 E02D29/045
代理机构 代理人
主权项
地址