发明名称 Roadway, tunnel and gallery blocking method for e.g. mine, involves filling breaking line with ballast, which is fixed ahead and behind sealing structure, and clamping sealing structure on both sides by ballast filling
摘要 <p>The method involves providing a high breaking line (5) in a form of a sealing structure ahead and behind a sealing element (4). The breaking line is filled with a ballast, which is fixed ahead and behind the sealing structure. The sealing structure is clamped on both the sides by the ballast filling, and a large diameter borehole (6) is guided into upper ends of the high breaking line. A conveyor device is installed in the large diameter borehole for the ballast filling.</p>
申请公布号 DE102007025016(B3) 申请公布日期 2009.01.22
申请号 DE20071025016 申请日期 2007.05.28
申请人 BUNDESANSTALT FUER GEOWISSENSCHAFTEN UND ROHSTOFFE 发明人 EICHHORN, PETER;SCHNIER, HAJO
分类号 E21F17/16;E21F15/02;E21F15/04;E21F17/12 主分类号 E21F17/16
代理机构 代理人
主权项
地址