发明名称
摘要 PROBLEM TO BE SOLVED: To reduce the installation area of a substation, by providing a switching means between the secondary side of a transformer and each rectifier, and performing selection and switching the secondary side of the transformer over to either a normal system or preparatory system rectifier. SOLUTION: A transformer 3A and two rectifiers 4a, 4b are formed integrally and put on a common frame 12, and a switching device 11A which switches the secondary side of the transformer 3A over to one of individual rectifiers 4A, 4B to make switching over to an operating circuit or a preparatory circuit, is provided. And when the rectifier 4a constituting an operating circuit is switched over to the rectifier 4b constituting a preparatory circuit, a circuit- breaker 8A and a disconnector 9a under operation are made, and the switching device 11A is connected to a contact 11b side, and a preparatory circuit composed of the transformer 3A and the rectifier 4b is obtained. Consequently, it becomes possible to reduce the installation area of a substation, and besides to shorten a period required for its installation.
申请公布号 JP4212682(B2) 申请公布日期 2009.01.21
申请号 JP19980157647 申请日期 1998.06.05
申请人 发明人
分类号 H02B1/24;H02B5/00 主分类号 H02B1/24
代理机构 代理人
主权项
地址