摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a frame control method for performing connection control which is suitable from the viewpoint of transmission efficiency and a delay time in a TXOP period. <P>SOLUTION: In a communication system wherein a control station performs centralized control over a communication bandwidth for traffic of each communication terminal, the frame control method described in the claim comprises a communication state monitoring step of monitoring the communication state of the communication terminal, a connection number ratio determination step of determining a connection number ratio according to the communication state, and a frame connection number control step of controlling a frame connection number in a communication band imparted from the control station on the basis of the connection number ratio. <P>COPYRIGHT: (C)2009,JPO&INPIT</p> |