发明名称 BRIDGE CONSTRUCTION METHOD USING GIRDER UNIT INTEGRATED SLAB
摘要 A bridge construction method using a slab integrated girder unit is provided to construct a bridge simply, and to be effective and economic by minimizing the field work and overhead work for manufacturing a superstructure of a bridge. A bridge construction method using slab integrated girder units(100a,100b) comprises the steps of carrying a slab integrated girder unit which is manufactured in a precast segment integrated with a girder and a slab in a field and connecting at least two girder units horizontally in the field, placing the girder units connected with each other horizontally over the upper part of a substructure of a bridge, and integrating the girder units.
申请公布号 KR20080109983(A) 申请公布日期 2008.12.18
申请号 KR20070058165 申请日期 2007.06.14
申请人 WHEESUN CONSTRUCTION CO., LTD.;JOO, HWAN JOONG 发明人 JOO, HWAN JOONG
分类号 E01D2/00;E01D21/00 主分类号 E01D2/00
代理机构 代理人
主权项
地址