发明名称 CONSTRUCTION WORK OF UNDERGROUND STRUCTURE USING SHEATHING FRAME
摘要 PURPOSE:To raise the efficiency of the titled operation by widening an operating space for constructing an underground structure by a method in which a master pile and a cross sheet pile are set on a sheathing wall line, and the floor beam of the first floor is supported on the master pile prior to the construction of an underground structure. CONSTITUTION:A master pile 1 made up of H-shaped steels or rails is penetrated at each given interval along the sheathing wall line, and as the primary excavation 6 proceeds, cross sheet pile 2 is set between the master piles 1. The floor beam 3 of the first floor is set before the construction of the lower part of an underground structure and supported on the master pile 1 through a support metal 4. The secondary excavation 7 is made, an underground structure is constructed on the lower part of the beam 3, and the master piles 1 are removed out to eliminate the need for the setting period of temporary receiving columns. By directly supporting the beam 3 on the master piles 1, operating space can be widened, interference with the underground structure can be eliminated, and the efficiency of operations can be raised.
申请公布号 JPS59185232(A) 申请公布日期 1984.10.20
申请号 JP19830058701 申请日期 1983.04.05
申请人 TAISEI KENSETSU KK 发明人 MATSUBARA AKIRA;GOTOU TAKAYUKI;MIYOSHI KAZUNORI
分类号 E02D17/18;E02D17/04;E02D29/045;E21D13/00 主分类号 E02D17/18
代理机构 代理人
主权项
地址